[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: [alma-sw-ssr] pipeline requirements
Some additional comments, on the pipeline draft. I'm orry, this comes
too late for our US colleagues to read befor the meeting.
Robert
---------------------------------------------------------------
Note:
-----
requirement numbers will change when introduced in general document
(all pipeline reqs prefixed with 6.)
p5. General Requirements : generally operation -> operations. at many
places 'Calibration Operation" -> "Pipeline"
p5. R T C Op : add WVR
p6: The first two are RTCal Operations as ...
p6. 2-0.0-R7 runnable
p7 3-1.0-R3 scan -> observation
p 9 4-0.0-R3.2 (natural weighting)
p 9 4-0.0-R3.5 from theory and actual system temperatures
p 9 4-0.0-R4.3 window automatically determined ?
p 9 4-0.0-R4.4 spectra on a rectangular grid (why pseudo?)
p 9 4-0.0-R6.3 baseline summation with and without shifting phases to
specified position ?
p 9 4-0.0-R6.4 add: intensity (amp & Pha) as a function of frequency
and time
(for a baseline)
(useful to find out a strong delay error)
p 12 6-0.0-R1: after a breakpoint, or end of any `observing object'
e.g. when all data for a given map has been obtained,
but not necessary at end of each session. Valid also
for Science imaging.
--
Robert LUCAS, Institut de Radioastronomie Millimetrique
300 rue de la Piscine, F-38406 St Martin d'Heres Cedex (FRANCE)
Tel +33 (0)4 76 82 49 42 Fax +33 (0)4 76 51 59 38
E-mail: mailto:lucas@iram.fr http://iram.fr/~lucas/